CEFAS23-08 Contract Extension for BEEMS ABR Maintenance & Monitoring at the Hinkley Point C Frontage

Cefas · awarded 8 December 2025 · delivered in South West

£40k Award value £40,000
1 Supplier Size not recorded
31 Dec 2026 Runs until from 1 Jan 2026

Who

BuyerCefas Lowestoft
Supplier Marine Science Support Ltd
Categoryservices
ClassificationReservoir cleaning services CPV 90913200
Notice published11 December 2025

What it is for

The Supplier will undertake ad hoc Artificial Bunded Reservoir (ABR) maintenance and monitoring at the Hinkley Point C frontage. The ABR design was proposed by Cefas as a method to compensate for the water that was diverted away from unique and protected intertidal algal mats by damage caused by a walking jack-up barge, which interrupted the drainage network when it transited across the rocky foreshore while being used to construct a large aggregates jetty. The ABRs comprise of bunded walls strategically placed to form reservoirs that are filled on the rising tide and slowly release seawater when subsequently exposed by the ebbing tide. In total, there are four distinct ABR schemes on the Hinkley Point foreshore that comprise between one and seven individual reservoirs. Water exits through an orifice plate/outlet pipe installed in each of the bunds/cut channels that divide reservoirs. The size of these has been optimised to access as much water as possible over the low tide period. Occasional testing work is still conducted to ensure/improve the ongoing performance of these systems. Telemetric depth gauges are also installed in each reservoir to monitor the performance of each system. These automatically send data to Cefas but require occasional removal/installation for/following maintenance. The Supplier will be required to visit the site on an ad hoc basis to: (1) Clear reservoirs and the orifice plates. Reservoir clearing will be conducted by hand by carefully handling manageable sediment (mainly cobbles/boulders) and moving them to a nearby area of shore platform outside the reservoir. A shovel will be used to move finer gravelly material. The area around the orifice plate may also be cleared of finer material with a metal/wooden rod. (2) Conduct flow gauging work.…

Read the original award notice on Contracts Finder →

Other contracts from this buyer

128 awards on file, worth £16.0m.

Everything Cefas has awarded →

Other contracts won by this supplier

4 awards on file, worth £516k.

Everything Marine Science Support Ltd has won →