MCHFT RAAC Structural Engineering & Survey Inspections

Mid Cheshire Hospitals NHS Foundation Trust · awarded 2 October 2025 · delivered in England

£2.3m Award value £2,289,010
1 Supplier Recorded as a large business
23 Jul 2032 Runs until from 24 Jul 2025

Who

BuyerMid Cheshire Hospitals NHS Foundation Trust Crewe
Supplier Mott MacDonald Limited
Categoryservices
ClassificationStructural engineering consultancy services CPV 71312000
Notice published2 October 2025

What it is for

Leighton Hospital, built in the late 1960s and opened in 1972, is one of the most cost-effective acute hospitals and is a sister hospital to Airedale NHS Foundation Trust. Much of the original structure incorporates RAAC panels in its roof and walls, with over 16,500 roof panels and various internal and external wall panels, mostly non-load bearing. Extensive inspections and testing have been conducted, with a risk rating system (P1 to P4) applied to prioritise repairs. Ongoing remedial work includes the installation of steel frameworks, Unistrut supports, and timber reinforcements to address high-risk areas while maintaining hospital operations. RAAC management is overseen by the Estates team and supported by a detailed Structural Risk Appraisal and RAAC Management Plan. Mid Cheshire Hospitals NHS Foundation Trust undertook a further competition for Reinforced Autoclaved Aerated Concrete (RAAC) structural engineering and survey inspection services under the NHS Shared Business Services Healthcare Planning, Construction Consultancy and Ancillary Services Framework (SBS10190), Lot 3 - Civil and Structural Engineering. The services is required to deliver both structural engineering and surveying services, with data to be managed through a Common Data Environment provided by BIS Consult. This service will support a multi-year mitigation programme through to the hospital's planned replacement in 2032, after which the current buildings are expected to be demolished. The contract duration will be seven (7) years, up to the anticipated demolition of the current buildings in 2032. Should demolition be delayed beyond this date, the Contracting Authority reserves the right to extend the contract accordingly, subject to mutual agreement and continued service requirements.

Read the original award notice on Contracts Finder →

Other contracts from this buyer

15 awards on file, worth £6.4m.

Everything Mid Cheshire Hospitals NHS Foundation Trust has awarded →

Other contracts won by this supplier

169 awards on file, worth £1.3bn.

Everything Mott MacDonald Limited has won →