GB-Our Time Gallery: Main Works Contractor

London Museum · awarded 23 May 2025 · delivered in London

£2.1m Award value £2,150,000
1 Supplier Recorded as a small or medium-sized business
5 Oct 2026 Runs until from 3 Nov 2025

Who

BuyerLondon Museum London
Supplier Realm Projects Limited
Categoryworks
ClassificationConstruction work for buildings relating to exhibitions CPV 45212310
Notice published19 June 2025

What it is for

The Our Time Exhibition Main Works Contractor will be required to act as the Our Time Gallery Principal/Main contractor for CDM purposes in relation to the Our Time Exhibition. The contractor will be responsible for the fabrication, installation and commissioning of the majority of works for the Our Time Exhibition fitout. Please see summary below: •Drawing Coordination of all exhibition works, plus Client-direct works / appointments •Principal Contractor duties for the specific Our Time exhibition space only •Exhibition walls •Acoustic treatment •Setworks •Seating •Exhibition 3rd fix mechanical and electrical •Exhibition lighting and luminaires outside of showcases. All emergency lighting is by the Basebuild •Exhibition graphics and substrates •Vibration isolation due to the proximity of a railway to part of the Past Time exhibition •"As built" drawings •BIM

Read the original award notice on Contracts Finder →

Other contracts from this buyer

4 awards on file, worth £12.2m.

Everything London Museum has awarded →

Other contracts won by this supplier

2 awards on file, worth £4.8m.

Everything Realm Projects Limited has won →