Stoke Newington Library External Remedial Works

London Borough of Hackney · awarded 13 May 2025 · delivered in England

£2.2m Award value £2,155,732
1 Supplier Recorded as a small or medium-sized business
30 May 2026 Runs until from 9 Jun 2025

Who

BuyerLondon Borough of Hackney Hackney
Supplier Total Construction Ltd
Categoryworks
ClassificationRefurbishment work CPV 45453100
Notice published16 May 2025

What it is for

Stoke Newington Library is a Grade 2 Listed building located on Church Street in the heart of Stoke Newington. First built in 1892 the library has been extended and renovated several times. The library is considered to be an excellent example of a late Victorian public library. Although structurally sound, the general condition of the building has deteriorated significantly in recent years, mainly due to rainwater ingress. The library was closed to the public in March 2024 because areas of the roof had collapsed and the windows and masonry had fallen into such a poor state of repair that the building was no longer safe. This project will repair the damage to the building's fabric, ensuring that it will remain in sustainably good condition in future years.

Read the original award notice on Contracts Finder →

Other contracts from this buyer

218 awards on file, worth £428.3m.

Everything London Borough of Hackney has awarded →

Other contracts won by this supplier

1 award on file, worth £2.2m.

AwardedWhat forBuyerSupplierValue
13 May 2025 Stoke Newington Library External Remedial WorksEngland London Borough of Hackney Total Construction Ltd £2.2m

Everything Total Construction Ltd has won →