ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement
THE PIRBRIGHT INSTITUTE · awarded 21 November 2024
Who
| Buyer | THE PIRBRIGHT INSTITUTE WOKING |
|---|---|
| Supplier |
Fuel Conservation Services Limited |
| Category | services |
| Classification | Waste incinerators CPV 42320000 |
| Notice published | 21 February 2025 |
What it is for
Design and Build of Work re. Incinerator Kiln Refractory Lining replacement for the Primary and Secondary Combustion Chambers. The scope of works will involve: • Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation. • Supply and delivery of all refractory materials and anchors including any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops. • Deconstruction of existing refractory lining and Anchors (Disposal of waste by others) • Installation of the new anchors and refractory lining as per agreed detailed design. • Management of drying out and curing of the lining. • Management of all subcontractors employed by the supplier to complete these works. • Submission of O&M containing all required details as per PIF and separate section to provide information needed for the Health and Safety File. Please see Contract Scope section in ITT document. Additional information: Please note that Appendix H - Confidentiality Agreement must be completed, signed, and emailed to Procurement.Department@pirbright.ac.uk asap. Then and only then will access to the full ITT package (Appendix E1 - Site Documents, Appendix E2 - Incinerator Dimensions and Appendix E3 - Front Plate Technical Datasheets) be granted to the requester.
Read the original award notice on Contracts Finder →
Other contracts from this buyer
7 awards on file, worth £7.3m.
Everything THE PIRBRIGHT INSTITUTE has awarded →
Other contracts won by this supplier
1 award on file, worth £455k.
| Awarded | What for | Buyer | Supplier | Value |
|---|---|---|---|---|
| 21 Nov 2024 | ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement | THE PIRBRIGHT INSTITUTE | Fuel Conservation Services Limited | £455k |