G5-1_HBC/HCC_045 Emsworth Town Accessibility Improvements

HAMPSHIRE COUNTY COUNCIL · awarded 21 October 2024 · delivered in South East

£64k Award value £63,711
1 Supplier Recorded as a small or medium-sized business
13 Dec 2024 Runs until from 11 Nov 2024

Who

BuyerHAMPSHIRE COUNTY COUNCIL WINCHESTER
Supplier Mays Technical Limited
Categoryworks
ClassificationConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CPV 45230000
Notice published6 December 2024

What it is for

3. Description of Call-offA call-off from Lot 1 of the Generation 5 Civil Engineering, Highways & Transportation Collaborative Framework 2024 - 2028 (award notice published 01 February 2024). Construction of a tighter junction on Bridge Road junction with Havant Road (A259) such that at its widest point it is 14m wide with a 4m radius on both sides. The works will include replacing the existing footway kerblines (total length 59m) on both sides of the road and 3 new gullies (2 of which are to be connected to a culvert and 1 to a manhole). Tactile paving slabs are to be installed on both sides of the tightened junction. The works also include the widening of a footway outside 167 - 187 Victoria Road to 2m (total length 50m)

Read the original award notice on Contracts Finder →

Other contracts from this buyer

1288 awards on file, worth £11.0bn.

Everything HAMPSHIRE COUNTY COUNCIL has awarded →

Other contracts won by this supplier

4 awards on file, worth £62.6m.

Everything Mays Technical Limited has won →