RACE STORM MOCK UP JOINT STILLAGE

United Kingdom Atomic Energy Authority · awarded 2 September 2024

£20k Award value £20,000
1 Supplier Recorded as a large business
22 Nov 2024 Runs until from 2 Sep 2024

Who

BuyerUnited Kingdom Atomic Energy Authority Abingdon
Supplier Dal Ben SPA
Categorygoods
ClassificationIndustrial machinery CPV 42000000
Notice published4 September 2024

What it is for

UK Atomic Energy Authority (UKAEA), based at the Culham Science Centre in Oxfordshire, hereafter referred to as the Purchaser, carries out research into the use of controlled fusion for the generation of power. As part of this work, the manufacture and assembly of a Return Limb Pedestal Stillage (hereafter referred to as the 'Stillage) is required. The stillage assembly forms part of the mock-up test facility and is for the temporary storage of a return limb pedestal. The stillage assembly is designed for the storage of a return limb pedestal. It is a welded and bolted assembly and is comprised of the following main components: • Alignment fixtures • Stillage fabrication • Bottom support plates • Inner and outer locking plates • Bolted Base Plate The Supplier shall manufacture, inspect, and deliver 3-off complete Stillage, along with all associated fixings, to the Purchaser's delivery address. The assembled unit will comprise of the machined and fabricated components including all associated fasteners.

Read the original award notice on Contracts Finder →

Other contracts from this buyer

94 awards on file, worth £33.3m.

Everything United Kingdom Atomic Energy Authority has awarded →

Other contracts won by this supplier

4 awards on file, worth £370k.

Everything Dal Ben SPA has won →