CWF Lot 2A - Reconstruction of Scrithwaite Wood Retaining Wall

Westmorland and Furness Council · awarded 31 March 2025 · delivered in England

£117k Award value £116,867
1 Supplier Recorded as a large business
23 May 2025 Runs until from 28 Apr 2025

Who

BuyerWestmorland and Furness Council Kendal
Supplier Metcalfe Plant Hire Ltd
Categoryworks
ClassificationConstruction work CPV 45000000
Notice published31 March 2025

What it is for

his project is for the design and reconstruction of approximately 15m length of Scrithwaite Wood Retaining Wall on the C5008, North of Broughton Mills. The existing wall has partially collapsed, with an adjacent length being in an unstable condition. The wall retains approximately 2.1m (max) of land (public highway) above a steep inclined slope. The collapsed section of the wall has created a residual slope of consolidated material with a 1m vertical slope of exposed natural gravel material below the defined road construction. The Contractor will be required to undertake the role of Principal Designer & Principal Contractor and fulfil their obligations in accordance with CDM 2015. The Contractor will be required to design and construct the permanent engineered highway retaining wall. The Contractor will be required to design and check temporary works as required e.g. provision of shoring for excavation. The Contractor should consider the design period required for the temporary and permanent works, including Technical Approval to CG300 and Design & Check Certification - considered to be a Category 0 structure.

Read the original award notice on Contracts Finder →

Other contracts from this buyer

371 awards on file, worth £182.4m.

Everything Westmorland and Furness Council has awarded →

Other contracts won by this supplier

28 awards on file, worth £7.7m.

Everything Metcalfe Plant Hire Ltd has won →