The Supply of Electric Vehicle Charging Infrastructure and Associated Services 2025-2040 - AWARD

Bedford Borough Council · awarded 3 July 2026 · delivered in East of England

Award value No value published on this notice
1 Supplier Size not recorded
5 Oct 2040 Runs until from 6 Oct 2025

Who

BuyerBedford Borough Council England
Supplier Connected Kerb Limited
Categoryservices
ClassificationInstallation of cable infrastructure CPV 45314300
Notice published6 July 2026

What it is for

The purpose of this ITT is to appoint a single Charge Point Operator, to deliver Bedford Borough Council's requirements for a "full turnkey" solution to supply, install, connect, commission, operate and maintain a network of charge points on behalf of the Council across the Borough. We expect the winning bidder to deliver a minimum of 512 additional new Electric Vehicle "sockets" (as defined in the Contract at Schedule 4), of which: i) A minimum of 256 sockets to be located at our required sites as set out in Portfolios 1, 2 and 3 (see section 2.2.3 in this document for further information), with our £1.01m subsidy to support installations. ii) Further to this we would like the operator to match and extend our investment through private funding with a minimum additional 256 sockets, at our required sites or at additional sites (to be agreed with the Council). iii) The total minimum delivery of at least 512 additional new Electric Vehicle "sockets." To this end, Bedford Borough Council (BBC) is primarily seeking for its required 256 sockets at the stated locations, a charging solution involving 7kw - 22kw power charge points across the Borough-wide network, to benefit residents without off street parking.

Read the original award notice on Contracts Finder →

Other contracts from this buyer

151 awards on file, worth £81.6m.

Everything Bedford Borough Council has awarded →

Other contracts won by this supplier

12 awards on file, worth £183.1m.

Everything Connected Kerb Limited has won →